Hurricane Sandy Relief Coming to Sheepshead Bay, Brooklyn

C.A.C. is installing all of the infrastructure for dozens of homes and connecting them to the public system under NYC’s Build It Back Program. Under a contract known as Stanton Court, all of the sewer, water, and utilities are being installed at the same time that the houses are being raised above flood level.

The project is complex due to the extremely narrow streets, some of which are wide enough only for pedestrians, and for its accelerating schedule.

After the underground infrastructure is completed on this $8 Million-Dollar project, C.A.C. will install precast porous concrete pavers as a part of the surface restoration.